Pre-commencement Conditions — 31 Stevens Lane
Pre-commencement Conditions Schedule

Pre-commencement conditions: 31 Stevens Lane, KT10 0TD

The conditions below are reproduced verbatim from the schedule attached to the Planning Inspectorate's appeal decision. This page collates only the conditions worded as conditions precedent — those using "no development shall take place/commence until…" language — since these are the ones that must be formally discharged before any work, including site mobilisation, may lawfully begin. It does not assert that any breach has occurred; it is a reference for anyone monitoring the site, and it is not legal advice.

Appeal ref.
APP/6006033
Decision date
10 August 2026
Notice status
Published — 21/09/2026
Last confirmed
21/09/2026
01

Why these conditions carry particular weight

Public record

The Inspector's decision states plainly why certain conditions were imposed as conditions precedent: "several of the foregoing conditions are pre-commencement conditions because the matters they address, including ecological protection, construction management, drainage design and arboricultural protection, must be agreed before development begins if they are to be effective." Six conditions in the attached schedule use "no development shall take place/commence until…" wording. Work carried out before a genuine pre-commencement condition is formally discharged does not constitute a lawful "material start" — under the conditions-precedent principle (Whitley & Sons v Secretary of State for Wales), it risks leaving the whole permission, not just the affected part, not validly implemented.

Source Planning Inspectorate appeal decision, APP/6006033, paragraph 36.
02

The six pre-commencement conditions, verbatim

Public record
  • Condition 5ecological protection "No development shall take place until an Amphibian and Reptile Precautionary Method Statement has been submitted to and approved in writing by the local planning authority."
  • Condition 10construction management "No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by the local planning authority." (Covers vehicle parking, loading/unloading, plant storage, security hoarding, wheel washing, dust control, waste, and working hours.)
  • Condition 11tree planting specification "No development shall commence until a full specification of all proposed tree planting, and updated Tree Constraints Plan and Tree Protection Plan have been submitted to and approved in writing by the local planning authority."
  • Condition 14pre-commencement site meeting "No development including groundworks and demolition shall take place, and no equipment, machinery or materials shall be brought onto the site for the purposes of the development until a pre-commencement meeting has been held on site and attended by a suitably qualified arboriculturist, representative from the local planning authority and the site manager/foreman." This condition bars even bringing machinery or materials onto site — not only starting works — until that meeting takes place, which in turn depends on Condition 11 having already been approved.
  • Condition 16arboricultural supervision scheme "No development shall take place until a scheme of supervision for the arboricultural protection measures has been submitted to and approved in writing by the local planning authority."
  • Condition 19drainage "No development shall take place until a detailed surface water drainage scheme for the site... has been submitted to and approved in writing by the local planning authority."
Source Planning Inspectorate appeal decision, APP/6006033, conditions schedule (Conditions 5, 10, 11, 14, 16 and 19).
03

The tree-related conditions and the permission's own reasoning

Public record

This permission was granted despite the Inspector finding that the loss of a protected oak (T012, TPO EL:25/10) causes moderate harm to the character and appearance of the area — harm the Inspector found to be outweighed by other material considerations, including the replacement planting and tree-protection package. Conditions 11, 13, 14, 15, 16, 17 and 18 together form that package; of these, Conditions 11, 14 and 16 are worded as conditions precedent (reproduced above). Because this planting and protection scheme is what the permission's own reasoning relies on to offset the identified harm, whether it is discharged and implemented exactly as approved is material to the basis on which permission was granted, not simply one condition among many.

Source Planning Inspectorate appeal decision, APP/6006033, paragraphs 5–13 and 27, 33.
04

Other conditions

Conditions 4, 6, 7, 8, 9 and 12 are occupation conditions ("the dwellings shall not be occupied until…"), rather than pre-commencement conditions — they take effect at the end of the build rather than the start, so they are not reproduced here. The approved plans, time-limit and materials conditions, and the obscure-glazing condition (Condition 4), are also part of the schedule but are not conditions precedent in the same sense.

05

What happens if a pre-commencement condition is breached

This is general information about the local planning authority's enforcement powers under the Town and Country Planning Act 1990, as amended by the Levelling-up and Regeneration Act 2023 — enforcement action is a matter for the local planning authority, not for residents directly, and nothing here asserts that any breach has occurred.

Because the six conditions above are worded as true conditions precedent, works carried out in breach of one may mean the development was never lawfully begun at all — potentially affecting the whole permission, not only the specific works. Available enforcement mechanisms include:

  • Breach of Condition Notice — no right of appeal; 28 days to comply; since the April 2024 reforms, an unlimited fine for non-compliance (previously capped at £2,500).
  • Temporary Stop Notice — takes effect immediately on display; lasts up to 56 days; cannot be appealed; unlimited fine if ignored.
  • Full Stop Notice, alongside an Enforcement Notice — also takes effect immediately, with no compliance grace period.
  • Enforcement Notice — can be appealed by the developer, but breaching it once in force is a criminal offence, opening the door to prosecution or to the council carrying out remedial works and recovering the cost.
  • Injunction (section 187B, Town and Country Planning Act 1990) — a court order restraining the breach, available where speed is required.

Enforcement action taken after 25 April 2024 falls under the current single enforcement time limit of 10 years (replacing the previous 4-year limit for operational development), so there is no realistic prospect of a breach becoming immune from enforcement through the mere passage of time within that period.

Source Town and Country Planning Act 1990 (as amended by the Levelling-up and Regeneration Act 2023); Whitley & Sons v Secretary of State for Wales (1992) 64 P & CR 296.